Data on sprytne.com is aggregated from official U.S. Government sources including the SEC EDGAR database, USAspending.gov, USPTO, and U.S. Census Bureau. In accordance with 17 U.S.C. § 105, works of the U.S. Government are not subject to copyright protection and reside in the Public Domain. sprytne.com provides value-added visualization and algorithmic analysis of these public records.
Not financial advice. sprytne.com is an automated market intelligence platform. We are not a registered investment advisor, broker, or dealer. Financial metrics, risk scores, and federal award data are for informational purposes only. Past performance (including government contract history) is not indicative of future market results. Verify all data via official SEC.gov filings.
This platform adheres to CCPA/GDPR standards regarding professional and public business data. Information displayed pertains to commercial entities and public officers in their professional capacity. For data verification or removal requests regarding non-public information, please visit our Contact page. Operated under Brand House Data Systems framework.
© 2026 sprytne.com — Institutional Data Intelligence — Federal Transparency Initiative
Ticker ERII · Nasdaq · DE
Energy Recovery, Inc. is a U.S. business entity operating within the Special Industry Machinery, NEC sector (SIC 3559). Publicly traded on the Nasdaq under the ticker symbol ERII, the company is incorporated in Delaware. Based on SEC EDGAR filings, ERII reported fiscal year 2025 revenue of $135.0M, reflecting a year-over-year decline of 6.9%. Our proprietary Semantic Risk Score of 14 indicates high transparency and low reporting risk, derived from the frequency and consistency of 10-K, 10-Q, and 8-K filing patterns. As part of the SIC 3559 classification, Energy Recovery, Inc. serves as a key benchmark for investors and analysts monitoring Delaware corporate performance.
Comparison based on Standard Industrial Classification (SIC) mapping from SEC EDGAR filings.
Filing data sourced from SEC EDGAR signals. 10-K = annual report · 10-Q = quarterly · 8-K = material event.
Energy Recovery, Inc. (ERII) — Key efficiency & solvency metrics · FY2025
Operating Margin
Sector avg: 4.77%
Net Margin
Sector avg: -22.7%
Debt-to-Equity
Sector avg: 0.6
Current Ratio
Sector avg: 3.78
| Key Metric | Company | Industry Avg | Status |
|---|---|---|---|
| Total RevenueYoY: -6.9% | $135.0M | $1.59B | ▼ Lagging |
| Net IncomeYoY: -0.4% | $23.0M | — | — |
| Operating MarginOperating income as % of revenue | 17.7% | 4.77% | ▲ Outperform |
| Net MarginNet income as % of revenue | 17% | -22.7% | ▲ Outperform |
| Debt-to-EquityTotal liabilities / stockholders equity. Lower = safer. | 0.12 | 0.6 | ▲ Stable |
| Current RatioCurrent assets / current liabilities. Above 1.0 = solvent. | 10.44 | 3.78 | ▲ Outperform |
Source: SEC EDGAR XBRL filings (10-K annual reports). Industry benchmarks derived from 14 companies in SIC 3559.
Disclaimer: All financial data is sourced from raw SEC EDGAR filings. Sprytne.com provides automated data visualization and algorithmic analysis for informational purposes only. This is NOT financial advice, a recommendation to buy/sell, or a guarantee of accuracy. Always verify data via official SEC sources before making investment decisions.
Federal Contracts
THIS NEW TASK ORDER IS TO UTILIZE INFLATION REDUCTION ACT FUNDS FOR NBACC ENERGY RECOVERY SYSTEM PHASE II.
IGF::OT::IGF:: REPAIR HVAC/ENERGY RECOVERY BLDG. 117
IGF::CL::IGF MATERIALS FOR TRANSDUCTION (MATRIX): HIGH-POWER-DENSITY THERMOELECTRIC ENERGY RECOVERY FOR EXTENDED RANGE/MULTI-PURPOSE (ER/MP) AIRCRAFT (HIPD-TERERA) THE CONTRACT IS THE SPONSORING AGREEMENT BETWEEN THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION NASA AND THE CALIFORNIA INSTITUTE OF TECHNOLOGY-CONTRACTOR, A PRIVATE NONPROFIT EDUCATIONAL INSTITUTION, WHICH ESTABLISHES THE RELATIONSHIP FOR THE OPERATION OF THE FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER-FFRDC KNOWN AS THE JET PROPULSION LABORATORY. THE CONTRACTOR, JPL, IS REQUIRED TO PERFORM WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE NASA MANAGEMENT OFFICE-NMO CONTRACTING OFFICERS. NASA-SPONSORED WORK: JPLS PRIMARY MISSION IS TO SUPPORT THE NASA SCIENCE MISSION DIRECTORATE-SMD IN CARRYING OUT THE SPECIFIC OBJECTIVES IDENTIFIED IN THE SMD SCIENCE PLAN. THE FOUR BROAD SCIENTIFIC AREAS ARE: EARTH SCIENCE, PLANETARY SCIENCE, HELIOPHYSICS, AND ASTROPHYSICS. IN PERFORMANCE OF THIS CONTRACT, JPL SHALL: 1. SUPPLY A BROAD BASE OF SCIENTIFIC AND TECHNICAL CAPABILITIES RELEVANT TO NASA PROGRAM AND PROJECT RESPONSIBILITIES AND ASSIGNMENTS. 2. FOSTER ITS UNIQUE RELATIONSHIP WITH A TOP-TIER UNIVERSITY TO FACILITATE THE INVOLVEMENT OF SCIENTISTS, ENGINEERS, AND STUDENTS FROM THE UNIVERSITY AND RESEARCH COMMUNITIES IN NASA MISSION AND IN SUPPORTING OTHER GOVERNMENT AGENCIES. 3. SUPPORT NASA IN ENABLING PROGRAM AND INSTITUTIONAL CAPABILITIES. 4. DEVELOP SPACECRAFT AND INSTRUMENTS THAT ARE SENT TO VARIOUS DESTINATIONS WITH OUR SOLAR SYSTEM, INCLUDING EARTH ORBIT, PLANETS, PLANETARY SATELLITES, ASTEROIDS, AND COMETS. THESE MISSIONS MAY BE ORBITERS, LANDERS, OR ROVERS, AND TYPICALLY INCLUDE CUTTING-EDGE TECHNOLOGIES REQUIRED TO MEET SCIENTIFIC REQUIREMENTS. 5. PERFORM PROJECT TASKS INVOLVING: I-AUTONOMOUS DEEP-SPACE, INNER-SPACE AND EARTH-ORBITING SPACECRAFT OR MAJOR SUBSYSTEMS, II-EXPERIMENTS, INSTRUMENTS, OR OTHER DEVICES WHICH MAY BE CARRIED AS PAYLOAD ON SPACECRAFTS IN MISSIONS MANAGED BY OTHERS, AND-OR III-GROUND-BASED SYSTEMS. 6. BEYOND ITS PRIMARY MISSION, JPL MAY PERFORM WORK FOR OTHER NASA MISSION DIRECTORATES OR OFFICES. 7. JPL IS ALSO RESPONSIBLE FOR THE OPERATION, RESEARCH, TECHNOLOGY INSERTION, AND MANAGEMENT OF NASAS DEEP SPACE NETWORK TO PROVIDE TELECOMMUNICATION AND OPERATION SERVICES, INCLUDING DATA ACQUISITION AND DATA DELIVERY REQUIRED TO MEET ESTABLISHED AGENCY OBJECTIVES. 8. JPL IS ALSO REQUIRED TO MAINTAIN AND CONDUCT AN EDUCATION PROGRAM IN CLOSE COORDINATION WITH THE NASA HEADQUARTERS EDUCATION OFFICE, THE ACADEMIC COMMUNITY AT LARGE, AND IN SUPPORT TO NASA STRATEGIC OBJECTIVES TO IMPROVE STUDENT RETENTION IN THE SCIENCE, TECHNOLOGY, ENGINEERING, AND MATHEMATICS-STEM DISCIPLINES. WORK FOR NON-NASA SPONSORS: JPL MAY PERFORM WORK FOR NON-NASA SPONSORS. THIS WORK WILL BE DESIGNATED IN TASK ORDERS ISSUED BY NMO CONTRACTING OFFICERS BASED ON TASK PLANS INITIATED BY THE CONTRACTOR.
IGF::OT::IGF LXEZ 16-1331, RENOVATE 31 RQS RESCUE AND RECOVERY FACILITY, B-3490, KADENA AIR BASE. MINOR CONSTRUCTION WORK: NEW EXTERIOR EQUIPMENT DRYING AREA SHALL BE CONSTRUCTED WITH CONCRETE FLOOR AND ROOF SLAB. PAINT NEW COLUMNS AND EXPOSED CEILING AND VERTICAL SURFACES. WALLS SHALL BE FLOOR TO ROOF GALVANIZED IRON (GI) CHAIN LINKED ENCLOSURE WITH GATES, UTILITY LINES TO INCLUDE WATER SUPPLY, DRAIN, LIGHT FIXTURES AND OTHER ELECTRICAL SUPPORT AND OTHER SIMILAR WORK. CONSTRUCT 18 SPACE PARKING AREA WITH EXTERIOR LIGHTING. REPAIR WORK: SHALL INCLUDE BUT NOT LIMITED TO REMOVAL OF METAL HANGAR DOORS TO INCLUDE TRACKS AND RAILS AND REPLACE WITH APPROPRIATE WALL SYSTEM (CONCRETE AND/OR METAL STRUCTURE) WITH FIXED WINDOWS, ROLL-UP DOOR AND ALUMINUM DOORS; REPLACE EXISTING ROLL-UP DOOR; UPGRADE INTEL ROOMS TO OPEN STORAGE CLASSIFICATION VAULT REQUIREMENT; NEW GI CHAIN LINK PERSONAL GEAR CAGES, EXTEND ALERT ROOM (TWO STORIES), REPLACE CARPET, PAINT INTERIOR WALLS AND REPLACE DAMAGED CEILING TILES IN OFFICE AREA (1ST AND 2ND FLOOR), ALERT ROOM AND OPERATIONS OFFICE, AIR CONDITIONING UNITS, ENERGY RECOVERY VENTILATION UNITS, MODIFY FIRE PROTECTION SYSTEM AS REQUIRED; CONSTRUCT UNISEX LATRINE AND SHOWER STALLS, INSTALL AIR CONDITIONING UNITS WITH ENERGY RECOVERY VENTILATION UNITS IN NEW ROOMS; PROVIDE/REPLACE EXTERIOR LIGHTS; REPLACE GRATING WITH METAL PLATE COVER OVER EXISTING TRENCH; AND OTHER CIVIL, MECHANICAL AND ELECTRICAL SUPPORT WORKS AND OTHER SIMILAR WORK.
REPLACE, REPAIR, AND RECONSTRUCT ENERGY RECOVERY UNITS AND ALL ASSOCIATED DUCT WORK IN FOUR BUILDINGS.
COMBINATION HIGH-PRESSURE PUMP AND ENERGY RECOVERY DEVICE THAT WILL RECOVER THE HYDRAULIC ENERGY FROM THE BRINE STREAM AND TRANSMIT IT DIRECTLY TO THE HIGH PRESSURE PUMP.
IGF::OT::IGF - TDA RESEARCH, INC. IS DEVELOPING A COMPACT, LOW POWER, NEXT-GENERATION EXERCISE DEVICE (NGRED) THAT CAN GENERATE ANY FORCE BETWEEN 5 AND 600 LBF. WE USE A CLOSED LOOP CONTROL SYSTEM AND A SERVO MOTOR TO SMOOTHLY AND ACCURATELY SIMULATE THE GRAVITATIONAL AND INERTIAL LOADS OF LIFTING A WEIGHT ON EARTH. HOWEVER, BECAUSE THE SYSTEM USES A COMPUTER-CONTROLLED MOTOR, THE LOAD CAN BE VARIED INDEPENDENTLY DURING THE CONCENTRIC AND ECCENTRIC PHASE OF THE EXERCISE. THUS, THE SYSTEM CAN EASILY PROVIDE AN ECCENTRIC OVERLOAD DURING THE RETURN STROKE, GREATLY INCREASING THE PHYSIOLOGICAL BENEFIT OF A WORKOUT. THE NGRED HAS A USER-FRIENDLY INTERFACE WHERE THE EXERCISE IS SELECTED FROM A DROP-DOWN MENU, ALONG WITH THE DESIRED WEIGHT AND OVERLOAD. THE NGRED WILL AUTOMATICALLY ADJUST TO THE USER'S STORED RANGE OF MOTION (ROM) FOR THE SELECTED EXERCISE AND APPLY THE SET LOAD ONLY DURING THE ROM. THE NGRED AUTOMATICALLY APPLIES THE ECCENTRIC OVERLOAD AT THE TOP OF THE ROM AND ADVANCES TO THE NEXT REP AT THE BOTTOM. THE TIME REQUIRED TO CHANGE BETWEEN USERS, EXERCISES, AND WEIGHTS IS LESS THAN 10 SECONDS. THIS MAKES MUCH BETTER USE OF THE ASTRONAUT'S TIME; WITH CURRENT MECHANICALLY ADJUSTABLE EXERCISE MACHINES UP TO TWO THIRDS OF THE TIME IS SPENT ADJUSTING THE MACHINE. THE SOFTWARE INCLUDES DATA LOGGING AND COMMUNICATION ABILITIES TO MEET NASA REQUIREMENTS AS WELL AS REDUNDANT HARDWARE AND SOFTWARE FAIL-SAFE MECHANISMS. THE NGRED INCLUDES AN EFFICIENT ENERGY RECOVERY SYSTEM WHICH STORES THE ENERGY GENERATED BY THE USER DURING THE CONCENTRIC PHASE OF THE MOTION (PULL STROKE) AND APPLIES THAT ENERGY TO PROVIDE RESISTANCE DURING THE ECCENTRIC PHASE (RETURN STROKE). THE AVERAGE POWER CONSUMPTION OF THE NGRED WILL BE LESS THAN 50 W DURING AN EXERCISE SESSION. THE EXPECTED WEIGHT OF THE NGRED AT THE END OF PHASE II WILL BE 20 KG, AND THE TOTAL VOLUME IS EXPECTED TO BE 55 L, INCLUDING ALL ELECTRONICS AND CONTROLS. A FLIGHT-LIKE NGRED WILL BE DELIVERED TO NASA AT THE END OF PHASE II.
MINOR CONSTRUCTION TASK ORDER TO REPLACE AIR HANDLERS AND ENERGY RECOVERY VENTILATORS 4315-ERU0001 AND 4315-ERU0002 IN BUILDING 4315 PER FWR R001084590 IFB PACKAGE.
FY21-22 EPA SBIR PHASE II - ZERO-WASTE (ZEWA) WATER AND ENERGY RECOVERY SYSTEM
THE CONTRACTOR MUST PROVIDE AND INSTALL TWO (2) CHILLER COMPRESSOR MOTORS AND ONE (1) ENERGY RECOVERY UNIT WHEEL REPLACEMENT @ MICKEY LELAND FEDERAL BUILDING, 1919 SMITH STREET, HOUSTON, TX 77002
Source: USAspending.gov (Official Federal Award Data). Reflects prime contracts only. Last sync: 2026-03-30.
Compared to 15 peers in Special Industry Machinery, NEC (SIC 3559)
Revenue
Net Margin
SEC EDGAR XBRL filings by fiscal year
Side-by-side financial showdown — revenue, margins, and growth.
Methodology & compliance note
Data is aggregated from SEC EDGAR and Secretary of State public records. Any analytics such as "market share" are statistical estimates (proxy models) and are not official audits, valuations, or investment advice. Sprytne.com is an independent data aggregator and is not affiliated with any government agency.Learn more →